top of page
Exousia-01.png
C 33.jpg

Duration-3 Months
Main Project - High-rise Residential tower, Dubai

The following segment knowledge is essential for an electrical design engineer.
We provide the ultimate work experience and knowledge through practical training.

TOPICS COVERED

Introduction to MEP System

Introduction to Electrical services for the building

Role of Electrical Design engineer

Working with the AutoCAD software

Lighting System

Power System

HVAC Plumbing Implementation

Electrical Room section Drawings

Determine the Bill of Quantity and Estimation.

Fire alarm and voice evacuation

Emergency Lighting System

Telecom system

CCTV and Access Control system

Intercom system

Submission of drawings for Consultants / Client's approval.

Submission of drawings for Authority's approval.

TRAINING GUIDE CONTENTS

Introduction to MEP System

Introduction to Electrical services for the building

Load calculation and Design Basis Report

Mark-up Drawings

LIGHTING SYSTEM

Lux Level Calculation

Light fixture selection

Light fixture Arrangement

Circuiting/Grouping as per standards

Light Fixture Controlling

DB Schedule and Circuit Number

 

POWER SYSTEM

Electrical Generation, Transmission & Distribution General concept

Power outlet selection and Placing

Circuiting/Grouping as per standards

DB Schedule and Circuit Number

Containment selection for Lighting & Small power

 

Power Schematic diagram (Single line diagram-SLD)

Breaker/Isolator rating and type selection

Power cables & wires type, uses and type selection

Bus bar system for Electrical distribution & selection

Power provisions for equipment

UPS & Diesel Generator set uses and rating selections

DB Schedule CLMD

Containment system for power cables

Cable tray/ Trunking Selection, routing and Calculation

Voltage Drop Calculations

Panel boards type and uses

Capacitor bank uses & selection

MCC panel & starter selection for the Mechanical & HVAC equipment.

HVAC and Plumbing Details and Implementation

Electrical plant rooms & requirements

LV room, Electrical rooms, Generator rooms and Substations arrangements.

Submission of drawings for Consultants / Clients approval.

Submission of drawings for Authorities approval.

Electrical Room section Drawings

Determine the Bill of Quantity and Estimation.

FIRE ALARM SYSTEM AND VOICE EVACUATION SYSTEM

Introduction to Fire alarm system and Voice evacuation

Components Selection and Placing.

Looping and Circuit numbers

Schematic diagram (Single line diagram-SLD)

Submission of drawings for Authority's approval.

EMERGENCY LIGHTING SYSTEM

Introduction to Emergency lighting layout

Components Selection and Placing.

Looping and Circuit numbers

Schematic diagram (Single line diagram-SLD)

Submission of drawings for Authority's approval.

TELECOM SYSTEM

Introduction to Telecom /Structured cabling system

Fiber/Copper distribution

Schematic diagram (Single line diagram-SLD)

Submission of drawings for Authority's approval.

CCTV AND ACCESS CONTROL SYSTEM

Introduction to CCTV and Access control system

Components Selection and Placing.

Fiber/Copper distribution

Schematic diagram (Single line diagram-SLD)

Submission of drawings for Authority's approval.

INTERCOM SYSTEM

Introduction to Intercom system

Components Selection and Placing.

Fiber/Copper distribution

Schematic diagram (Single line diagram-SLD)

PREPARATION OF COMPLETE TYPES OF DRAWING

Concept /Preliminary Drawings

Design  Drawings

Tender Drawings

Shop Drawings

As-built Drawings

bottom of page